|
|
|
|
|
|
|
|
- (1)
- (2)
- (2)
- (1)
- (1)
- (2)
- (1)
- (1)
- (5)
- (6)
|
|
|
|
|
Build Your Online Product Catalogs?
Product Name: |
Quick Steel modular formwork system
|
Supply Ability: |
300 TONS PER DAY |
Related proudcts |
construction formwor, scaffolding props, |
Specifications |
Sizes of Horizontal Pole;1.22m,0.87m,0.47m |
Price Term: |
FOB |
Port of loading: |
TIANJIN |
Minimum Order |
20 TON |
Unit Price: |
USD1,200/TON |
|
Quick Steel modular formwork system 1. ISO 9001, ISO18001,ISO14001 2.Q235, Diameter:48mm Steel Pipe 3,Suitable for any heights Function:
Used for supporting a ceiling / floor plank formwork, especially for tall buildings'construction, The combination of different sizes can suit for different projects.
Features:
1.this formwork is made up of Horizontal Pole,Vertical Props,screw rod and U -head
2.very easy and fast to connect each part together ,need no skill,only several workers can finish the work
3.the combination of different sizes can apply to different needs of length.
4.High quality steel material, can be reused for 300 times
Advantages:
1. high efficiency , need no techniques,it is easy to operate and can raise the work efficiency by 600%,(400 square meters can been finished within eight hours by four people )
2 .need no materials, nails, wire,wooden timbers or tools,so it can reduce much cost and save much timbers.
3. reliable safety , pure steel structure ,firm structure ,the connection and joint of each part is firm and stable
4 . easy to manage,keep a clean and neat construction site, ,helpful to enhance the project's image and strength
|
Company: |
Changli Xingminweiye Architecture Equipment Co.ltd
|
Contact: |
Ms. Fancy Fan |
Address: |
ZHANGGUANZHUANG VILLAGE SOUTH,GETIAOGANG TOWN ,CHANGLI COUNTY,CHINA |
Postcode: |
066600 |
Tel: |
86-0335-5966188 |
Fax: |
86-0335-2889966 |
E-mail: |
|
|
|